What should be agreed before production?
First, clarify the scope of work, then jointly confirm the price, schedule, and acceptance methods.
What documents are delivered and how are they accepted?
First, confirm the delivery list based on the platform and usage scenario. File parameters, acceptance thresholds, and responsible parties should be based on platform standards and the agreed project files. Do not use examples as a uniform commitment.
How to confirm translation, oral and role performances?
First, verify the meaning, tone, pauses, and lip-sync rhythm using a specified segment, then confirm the role audition and performance direction. After recording, review the synchronization of dialogue, terms, and emotional continuity based on the picture timecode; the audition scope and revision rounds are agreed upon at the project start.
What records should the Technical QC leave?
Before delivery, check the channels, loudness, peaks, audio-video synchronization, and file integrity according to the confirmed technical specifications, and compile the version list and issue records. Specific thresholds vary by platform and version, and should be based on project requirements.
What is included in the quote and how will the change be handled?
Please specify the content size, roles and languages, creative or casting requirements, post-production stages, and version numbers to confirm each item. If rewrites, retakes, changes in casting, or additional versions occur, first clarify the changed content, then assess the fees and schedule impact.
When will the duration be calculated, and can it be accelerated?
The schedule needs to be confirmed based on the availability of materials, scope of work, and resource arrangements. Please prepare scripts or samples, time plans, technical requirements, and acceptance responsible parties in advance, and agree on direction confirmation, stage reviews, and final acceptance nodes. For urgent projects, resource and acceptance time assessments need to be separately evaluated, and no uniform days are promised.
How is the scope of authorization and material management agreed upon?
Please confirm the usage purpose, region, and duration, as well as the personnel for accessing materials, delivery methods, and retention arrangements before project start. The specific scope should be based on the confirmed project files.